AC motor CZPT Automobile Motor:
Specification of Gearless traction device:
Design | HPQ4-seventy two-D |
Battery Voltage(VDC) | seventy two |
Rated Energy(kW) | 4 |
Peak Energy(kW) | eight |
Rated Velocity(RPM) | 3000R/MIN |
Peak Velocity(RPM) | 6800R/MIN |
Poles of Pairs | two |
Cooling Method | Air Cooling |
Rated Torque(NM) | twelve.7 |
Peak Torque(NM) | sixty six |
Protection Quality | IP54 |
Insulation Course | Course H |
Rated Present(A) | a hundred thirty |
Peak Existing(A) | 400 |
peak performance(%) | ninety five% |
Bodyweight(KG) | 21.5 |
Brand name | XIHU (WEST LAKE) DIS. |
Packing | 1PC/Wood Scenario |
Picket Scenario Measurement | 816 X 556 X 525=.24CBM |
Payment Term | T/T, L/C |
Delivery Time | 15 times |
Certificates | CE, CZPT, ISO14001:2004,IATF16949 |
Mass Production Time | 30 times |
Related electrical vehicle motor photographs:
Company Profile:
*Xihu (West Lake) Dis. Energy Co., Ltd. was establised in 2571 which owns two manufacturing bases: Xihu (West Lake) Dis. Energy(ZheJiang ) Co., Ltd. & Xihu (West Lake) Dis. Power(ZheJiang )Co., Ltd.
*It has more than one thousand personnel & addresses more than a spot of a hundred and ten,000m2. Advanced R&D crew which with more than one hundred ten staffs.
*Certificates: IATF16949, UCMP & CE, CZPT:2015, ISO45001:2018
*The Chinese Academy of Science Co-engineering Unit was set up given that 2013.
*Awarded the “Countrywide CZPT Business” & attained the “Countrywide Hello-Tech Innovation Fund Venture Reward”.
*With aggressive, substantial top quality & good services, we get a good reputation each at house & abroad.
AC motor workshop:
Certificates:
Go to Fairs:
FAQ:
one.What is your shipping and delivery time?
15-20days soon after get the deposit.
2.What is your payment?
T/T & L/C optional
three.How long is your warranty period?
two a long time right after deliveried
4.Do you have any certificates?
CE,SGS,CZPT,IATF16949,Etc
5.Do you have the import & export license?
We are official import & export licensed manufacturer.