Thanks to our broad item range and rich experiences in this sector, With a lot of years’ experience in these lines, we have been distinguished from other suppliers in China by our positive aspects in aggressive pricing, on-time supply, prompt responses, on-hand engineering help and great after-revenue services. we supply chromed bar and tubes for hydualic and pheumatic cylinders. AC motor Electric Motor vehicle Motor:
Specification of Gearless traction EPT:
Model | HPQ3-60A |
EPTattery Voltage(VDC) | 60 |
Rated EPT(kW) | three |
Peak EPT(kW) | 6 |
Rated Pace(RPM) | 3000R/MIN |
Peak Speed(RPM) | 6800R/MIN |
Poles of Pairs | two |
Cooling Method | Air Cooling |
Rated Torque(NM) | nine.5 |
Peak Torque(NM) | 64 |
Security Quality | IP54 |
Insulation Class | Class H |
Rated Current(A) | 65 |
Peak Current(A) | 260 |
EPT efficiency(%) | ninety five% |
Excess weight(KG) | 16.five |
EPTrand | XiHu (West Lake) Dis.HU (WEST LAKE) DIS. |
EPT | 1PC/Picket Situation |
Wood Case Measurement | 816 X 556 X 525=.24CEPTM |
Payment Phrase | T/T, L/C |
Shipping Time | 15 days |
Certificates | CE, ISO9001, ISO14001:2004,IATF16949 |
Mass Production Time | 30 times |
Equivalent electric powered automobile motor photographs:
Organization Profile:
*XiHu (West Lake) Dis.hu (West Lake) Dis. EPT Co., Ltd. was establised in 2571 which owns two manufacturing bases: XiHu (West Lake) Dis.hu (West Lake) Dis. EPT(EPTngsu) Co., Ltd. amp XiHu (West Lake) Dis.hu (West Lake) Dis. EPT(ZheJiang )Co., Ltd.
*It has a lot more than one thousand workers amp covers above a spot of 110,000m2. Advanced R ampD staff which with more than 110 staffs.
*Certificates: IATF16949, UCMP amp CE, ISO9001:2015, ISO45001:2018
*The EPT Academy of Science Co-engineering Unit was estabEPTd since 2013.
*Awarded the quotNational High-Tech EPTrprise quot amp attained the quotNational Hi-Tech EPT Fund Undertaking Reward quot.
*With competitive, high good quality amp good provider, we win a good popularity equally at home amp overseas.
Traction EPT worshop:
EVM (Electric powered Motor vehicle Motor) Workshop:
Certificates:
Show up at Fairs:
FAQ:
one.What is your shipping time?
fifteen-20daEPTafter get the deposit.
two.What is your payment?
T/T amp L/C optional
3.How EPT is your warranty time period?
2 several years after deliveried
four.Do you have any certificates?
CE,SGS,ISO9001,IATF16949,And so forth
five.Do you have the EPT amp export license?
We are formal EPT amp export accredited maker.